The Bangkok Wastewater Project – Stage 4 Works

Project Name: The Bangkok Wastewater Project – Stage 4 Works

Firm Name: TEAM Consulting Engineering and Management Co., Ltd.

Associate Firms: Mott Macdonald Ltd. GKW Consult

Location: Bangkok, Thailand

Project Owner: Bangkok Metropolitan Administration

Type of Project: Sanitation system

Value of Project: 3,482 million Baht

Period: December 2001- April 2006

Project Features:

Project components include:

1. Wastewater collection system comprising:-

  • Wastewater pipes of ∅ 400 mm. 2,300 mm., total length 26.4 km.
  • 175 manholes

2.  Wastewater treatment facilities comprising:-

  • Wastewater treatment plant, with capacity of 150,000 m.3/day
  • Equipment installation
  • Pipeline system installation
  • Electrical system installation
  • Control system  installation

The Consultant provides the following services to the BMA:

  • Auditing and approval of the Contractor’s design;
  • Examination and approval of the contractor’s programmer of  work;
  • Construction supervision (wastewater collector systems and the wastewater treatment plants);
  • Material, equipment, and facility tests (including inspection upon manufacture, prior to shipment);
  • Operation & maintenance
23 24 25

 


https://www.deriheru-navigation.com/
https://blogceta.zaragoza.unam.mx/wp-content/-/buntut77/
https://blogceta.zaragoza.unam.mx/wp-content/app/
scatter hitam
depo 5000
scatter hitam
sv388
Buntut77toto | Link Alternatif Login Buntut77 Resmi Menang Besar Terpecaya
Bizz77game: Situs Link Login Alternatif Menang Besar Bizz77 Terpecaya Online
bizz77
https://blogceta.zaragoza.unam.mx/wp-content/id-ID_scatter-hitam/
https://inlislite-lib.unm.ac.id/fiber/
https://ic.upstegal.ac.id/fund/
https://ic.upstegal.ac.id/public/scatter-hitam/
https://pelita.pn-pasarwajo.go.id/