Project Name: The Bangkok Government Center

Name of Company: Arun Chaiseri Consulting Engineers Company Limited.

Name of Associated Firm: A member of a consortium namely, “Government Center Design

Consultant (GCDC)”, comprising the following consulting firms:

  • Architects and Associates Co., Ltd.
  • Advance Energy and Environmental Engineering Co., Ltd.
  • A-Seven Corporation
  • Casa Co., Ltd.
  • D.C.M. 2000 Co., Ltd.
  • Environmental Engineering Consultants Co., Ltd.
  • Index International Group Co., Ltd.
  • P49 Design and Associates Co., Ltd.
  • P.L. Design Co., Ltd.
  • Southeast Asia Technology Co., Ltd.
  • Viriya Energy Design Architecture Co., Ltd.

Project Location:  Chaeng Watthana Road, Laksi District, Bangkok, Thailand

Project Owner:  Dhanarak Asset Development Company Limited (The Treasury Department, Ministry of Finance, Thailand)

Project Cost: 20,000 Million Baht

14

Scope of Services Civil and Structural Engineering Design Consultant of:

  1. Main Building A
  2. Main Building B
  3. Conference Center 1
  4. Conference Center 2

Project Description: The Bangkok Government Center is located on a vacant land having the total area of approx. 349 Rais. The land has two plots, Zone A along Chaeng Watthana Road (approx. 100 Rais) and Zone B adjacent to The Supreme Command Headquarters (approx. 197 Rais). The total usage area of the project is approx. 929,800 square meters. The project is a building complex consisting of the following:

  1. Main Building A: a 9-storey office building for court offices of The Ministry of Justice having the total area of 198,535 square meters.
  2. Main Building B: a 9-storey office building for five Ministries and other related offices having the total area of 407,430 square meters.
  3. Car Parking and Residential Building: a 4-storey parking building for the total of 5,500 cars and 10-storey apartment building having the total area of 274,664 square meters.
  4. Conference Center 1 and Conference Center 2: Conference center building having the total area of 29,973 square meters.
  5. Engineering System Building: having the total area of 2,200 square meters. The design process started in January 2005 and the construction was completed in 2008.