Hydropower Plant

Project NameHydropower Plant

Consultant : Consultants of Technology Co., Ltd.

Owner National Energy Administration (NEA)

CONSTRUCTION SUPERVISION OF HUAI PA THAO DAM

Location Chaiyaphum Province, Thailand

Description The Dam consists of 2 earth filling dams for generation of hydroelectricity at 4.5 MW and irrigation covering the area of 25,000 rai (4,000 ha.) downstream. Main features are

1. Upper dam, a homogeneous earth fill dam of 22 m. height and 870 m. in length. Power house and switch yard with designed generating capacity of 4.5 MW. The structural works include spillway, inlet channel, modified horseshoe conduit, power tunnel and access roads.

2. Lower dam, a homogeneous earth fill dam of 37.5 m. height and 286.6 m. in length. Structural works include spillway and access roads.

Construction Cost 434.5 Million Baht (17.38 Million $US) (1 $US : 25 Baht)

COT Engagement Construction Supervision

Duration 1990 -  1992

10


https://news.asosiasi-emiten.or.id/
https://www.deriheru-navigation.com/
https://blogceta.zaragoza.unam.mx/wp-content/-/buntut77/
https://blogceta.zaragoza.unam.mx/wp-content/app/
scatter hitam
depo 5000
scatter hitam
scatter hitam
sv388
Buntut77toto | Link Alternatif Login Buntut77 Resmi Menang Besar Terpecaya
Bizz77game: Situs Link Login Alternatif Menang Besar Bizz77 Terpecaya Online
bizz77