https://news.asosiasi-emiten.or.id/
https://polteksci.ac.id/blog/scatter-hitam/
https://www.deriheru-navigation.com/
https://stai-barru.ac.id/play/scatter-hitam/
https://blogceta.zaragoza.unam.mx/wp-content/-/buntut77/
https://blogceta.zaragoza.unam.mx/wp-content/app/
https://www.mtsaliman02.sch.id/apps/
buntut77
bizz77
slot thailand
slot mahjong ways
https://journal.merassa.id/lib/scatter-hitam-wins/
https://inlic.org/ojs/scatter-hitam/
Converting Plant Factory

Converting Plant Factory

Project NameConverting Plant Factory

Name of CompanyArun Chaiseri Consulting Engineers Company Limited

Name of Associated Firm None

Project Location Tha Toom District, Amphur Sri Maha Phote, Prachinburi, Thailand

Project Owner Advance Agro Public Company Limited

Project Cost 400 Million Baht

Scope of Services - Electrical/Mechanical/Sanitary Engineering Design Consultant

  • Fire Protection System Design Consultant
  • Water Supply Design Consultant
  • Civil and Structural Engineering Design Consultant
  • Construction Management and Supervision Consultant

Project Description The new Converting Plant project is situated on a vacant land in existing Advance Agro (Double A Paper) Factory. The factory building has the total area of approx. 45,000 square meters. Converting Plant has its main function to convert the rolled paper into sheet paper using sheeter machine to cut the paper into the size that the customer needed. Ream Wrapper is used to wrap the cut-size paper.

The design process was performed during 2007 and the construction supervision service was started since January 2008. The construction will be fully completed at the end of 2008.

26


https://news.asosiasi-emiten.or.id/
https://polteksci.ac.id/blog/scatter-hitam/
https://www.deriheru-navigation.com/
https://stai-barru.ac.id/play/scatter-hitam/
https://blogceta.zaragoza.unam.mx/wp-content/-/buntut77/
https://blogceta.zaragoza.unam.mx/wp-content/app/
https://www.mtsaliman02.sch.id/apps/
buntut77
bizz77
slot thailand
slot mahjong ways