Bangkok Metropolitan Region (BMR) Wastewater Management System Project: Northern and Western Areas

Project Name: Bangkok Metropolitan Region (BMR) Wastewater Management System Project: Northern and Western Areas

Firm Name: Camp Dresser & Mckee International Inc (CDM) (USA)

Associate Firms: MACRO Consultants Co Ltd (Thailand)

Location: Nonthaburi, Pathum Thani and Samut Sakhon, Nakhon Pathom Provinces, Thailand

Project Owner: Pollution Control Department

Type of Project: Wastewater Management

Period: December 1996 – May 1998

Project Features: The consultancy services include preliminary engineering design and preparation of tender documents. Project feature and tasks include :

The Northern Project Area:

1)The Northern Area of BMR consists of The Northern East Bank of BMA and urbanized areas in the Provinces of Nonthaburi and Pathum Thani.

2)Develop a preliminary engineering design and tender documents for the centralized wastewater collection, treatment and disposal systems for the 1,144 km2 of the northern project area.

3)The preliminary design includes wastewater facilities required in 2028, and preliminary selection of the first-phased facilities and service area to be served by the year 2008.

4)Types of facilities include interceptor sewers, pump station, wastewater treatment (ultimate capacity of 1,760,680 m3/d, effluent disposal, sewer extensions to serve major wet-process industries, and interception of flows from existing street drains.

5)The implementation program and cost are also planned at estimated Total construction base cost of 42,332 million baht excluding engineering and contingencies expenses.

The Western Project Area:

1)The Western Area of BMR consists of the West Bank portion of BMA and urbanized areas in the Provinces of Samut Sakhon and Nakhon Pathom

2)Develop a preliminary engineering design and tender documents for the centralized wastewater collection, treatment and disposal systems for the 1,125 km2 of the western project area.

3)Types of facilities include interceptor sewers, pump station, wastewater treatment (ultimate capacity of 1,743,500 m3/d, marine disposal, sewer extensions to serve major wet-process industries, and interception of flows from existing street drains.

4)The implementation program and cost are also planned at estimated Total construction base cost of 45,980 million baht excluding engineering and contingencies expenses.

27