Detailed Design Laem Chabang Industrial Complex

Project Name: Detailed Design Laem Chabang Industrial Complex

Consultant: Asian Engineering Consultants Corp., Ltd.

Country: Thailand

Project Location within Country: Lam Chabang, Chonburi, Thailand

Name of Client: National Economic and Social Development Board

Professional Staff Provided :

No. of Staff : 3

No. of Man-Months: 9

Start Date (Month/Year) 04/1987

Completion Date (Month/Year) 02/1988

Approximate Value of Services: US$ 0.906 M

Name of associated firm(s), if any: Proportion :

Pacific Consultants International 32.22 %

Nippon Koei Co., Ltd. 19.70 %

Sindhu Pulsirivong Consultants Co., Ltd. 10.78 %

Southeast Asia Technology Co., Ltd. 9.35 %

R.K.V. Engineering Consultants Co., Ltd. 6.93 %

ACT Consultants Co., Ltd.  7.36 %

Project Cost : US$ - M.  (1 US$ = 25 Baht)

Detailed Description of Actual Services provided :

Laem Chabang Industrial Complex is part of the Eastern Seaboard Development Program which is one of the high priority regional development programs presented in the Fifth National Economic and Social Development Plan. The Complex is aimed to serve the small scale, labor intensive and non-pollution type industries, while heavy or gas-related basic industries are located at Map Ta Phut Industrial Complex in Rayong.

13

The Project components comprise of:

  • Site Preparation : 368 hectares
  • Road and Bridge : 18 km. of flexible pavement roads 3-RC bridge at a total length of 50 m.
  • Drainage : 4.4 km. long of main drainage canal 20.6 km. of road side drains
  • Waster Supply System : one water treatment plant at capacity of 23,300cu.m./day 28 km. of distribution system
  • Wastewater Treatment Plant : one sewage treatment plant at capacity of 19,700 cu.m./day 25 km. of collection system 
  • Miscellaneous : Electrical distribution network

Detailed Description of Actual Services provided :

Consulting services include collection, review and evaluation of existing data regarding site reconnaissance survey; review of criteria/standard; review of previous studies; land ownership survey; preparation of outline plan; topographic/land survey; preparation of maps; preliminary design report and drawing; preparation of detailed design, tender documents; cost estimates; preparation of final report.

Highlight :

The Complex is aimed to serve the small scale, labor intensive and non-pollution type industries, while heavy or gas-related basic industries are located at Map Ta Phut Industrial Complex in Rayong.