Project Name : Mae Taeng-Mae Ngat-Mae Kuang Diversion Tunnel Project
Name of Company : Panya Consultants Co., Ltd.
Name of Associated Firm :
1.P&C Management Co., Ltd
2.Asdecon Corporation Co., Ltd.
3.Frontier Engineering Consultants Co., Ltd.
4.Index International Group Co., Ltd.
Location : Chiang Mai Province, Thailand
Client : The Royal Irrigation Department
Project Cost : 3,600 million baht
Type of Service : The scope of work is divided into two stages:
1.Study stage consists of two phases:
Phase 1 Study of project development options and initial environmental examination (IEE)
Phase 2 Feasibility study and environmental impact assessment (EIA)
2.Detailed design stage
Project Description : 1.The study of project development options showed that the Mae Taeng-Mae Ngat-Mae Kuang is an appropriate option comprising development of Mae Ngat-Mae Kuang and Mae Taeng-Mae Ngat diversion routes and Mae Faek-Mae Taeng pumping project.
2.The most appropriate diversion routes comprising Mae Taman Regulator, Mae Taeng-Mae Ngat and Mae Ngat- Mae Kuang diversion tunnels are selected to be studied.
3.Detailed design
3.1Mae Ngat-Mae Kuang Diversion Tunnel
(1) Diversion tunnel, 4.2 m in diameter and 22.975 km in length
(2) Intake structure : Gated Tower
- Guard gate : bulkhead gate, 4.2 m wide and 4.2 m high
- Operating gate : fix wheel gate, 4.2 m wide and 4.2 m high
(3) Outlet structure : Gated Tower
- Guard gate : bulkhead gate, 4.2 m wide and 4.2 m high
- Operating gate : fix wheel gate, 4.2 m wide and 4.2 m high
- Energy dissipater (stilling basin type III), 7 m wide and 10 m long
3.2Mae Taeng-Mae Ngat Diversion Route comprises:
(1) Mae Taman Diversion Dam and appurtenant structures
- Three flap regulating gates (12.50 x 3.50 m) and 10 fine sand sluice gates (0.80 x 1.00 m)
- Two coarse sand sluice gates (2.50 x 3.50 m) and a sand sluice tunnel with a diameter of 6 m and 160 m length
- Tunnel inlet structure (4.00 x 4.00 m)
(2) Diversion tunnels and appurtenant structures
- Mae Taeng-Mae Ngat Diversion Tunnel with a diameter of 4 m and 25.401 km length
- Sand trap tunnel, 14 m wide, 8 m high and 100 m long
- Siphon tunnel with a diameter of 3.85 m and 1,350 m length- Tunnel outlet structure (energy dissipater type I), 8 m wide and 12 m long
| < Prev | Next > |
|---|
VDO About CEAT