Project Name : Water Supply Pipeline Design and Installation Supervision
Consultant : Consultants of Technology Co., Ltd. (COT)
Location Chon Buri Province, Thailand
Owner Global Utilities Services Co., Ltd
Description Expansion of water distribution system in Leam Chabang Industrial Estate, includes HDPE pipes with 2,000 m. long and diameter of 800 mm. complying with the Metropolitan Waterworks Authority of Thailand’s standard.
Construction Cost 30 Million Baht (0.85 Million $US) (1 $US : 35 Baht )
COT Engagement
1. Engineering design
2. Installation supervision
Duration Design March - May 2007
Installation Supervision June - September 2007
| < Prev |
|---|
VDO About CEAT
Get the Flash Player to see this player.
Support: Simple Video Flash Player Module
We have 59 guests online